The final draft for the Neighbourhood Plan (NP) has now been completed and can be viewed by the link below.
Changes include:
– Taking into account comments made through the Regulation 14 Consultation
– Changes agreed with the NP Steering Group.
– The plan is now prepared to reference the Core Strategy and ADMP documents.
The next steps are to prepare the Basic Conditions Statement and Consultation Statement. Once the NP draft has been signed off by the NP Steering Group, this will be submitted formally to Sevenoaks District Council, and a SEA Scoping Opinion obtained.